The City of Easthampton, the Awarding Authority, invites sealed bids from responsible and eligible bidders for the Cherry Street Green Infrastructure Project in Easthampton, MA in accordance with documents prepared by Fuss & O’Neill, Inc. The project consists of 2,000 lf of roadway reconstruction, new curbing and sidewalks, construction of traditional and green stormwater infrastructure, replace 2,000 lf of 8 inch water main, install 2,100 lf of 12 inch sewer pipe, replace water hydrants & gate valves, replace water & sewer services to the property lines of existing residents, restore the Cherry St. stormwater outfall and use bioengineering to stabilize a deteriorating streambank at Brickyard Brook.